ANNOUNCEMENT
PPC S.A. announces that, due to increased inflows in the reservoirs of the Hydro Power Stations over the recent period, and in cooperation with the Independent Power Transmission Operator (IPTO), it will increase Hydro Power Generation for avoiding water overflows and floods.
Athens, March 24, 2016